Back to profile

The pipeline cycle went from 11 to 16 minutes down to under 20 seconds.

A drayage logistics operator, dispatch and billing pipeline that had to finish inside a working shift.

ValueMethodMeasured atScope
11 to 16 minutesTimed end to end on the production pipeline before the change2026-09-24Full nightly cycle, dispatch and billing data
6.8 to 17.3 seconds (under 20 s)Project audit of the rebuilt cycle, two orders of magnitude tighter2026-09-24Full nightly cycle on the same sources

What this does not prove

This is the cycle time improvement as recorded by the project audits, not a percentile across every historical run. It measures elapsed time, not the volume of work the cycle performs.