The pipeline cycle went from 11 to 16 minutes down to under 20 seconds.
A drayage logistics operator, dispatch and billing pipeline that had to finish inside a working shift.
| Value | Method | Measured at | Scope |
|---|---|---|---|
| 11 to 16 minutes | Timed end to end on the production pipeline before the change | 2026-09-24 | Full nightly cycle, dispatch and billing data |
| 6.8 to 17.3 seconds (under 20 s) | Project audit of the rebuilt cycle, two orders of magnitude tighter | 2026-09-24 | Full nightly cycle on the same sources |
What this does not prove
This is the cycle time improvement as recorded by the project audits, not a percentile across every historical run. It measures elapsed time, not the volume of work the cycle performs.